On this page you will find examples of projects successfully completed by the Argyle Maintenance Team. From roof to floor, internal and external, from minor patch and paint of a single hospital room, to historically listed Local Government assets, to concrete panels, to restaurants and bars and everything in between Argyle Maintenance Services does it all.

LOCAL GOVERNMENT – HAMILTON PERFORMING ARTS CENTRE

BEFORE

IN PROGRESS

AFTER

Project Completed:  May 2023
  • Hamiltion, Victoria
  • Complete Internal Paint
  • Southern Grampains Shire Council
  • $68,000

Complete new vision for this Performing Arts Auditorium a change in mood. Argyle Maintenance Service was proud to win at tender and be part of the transformation of the beautiful Shire asset. A complete change of colour altered the mood from light and airy to mystic and dreamy. Works included painting the ceiling off of a stepped floor, a special scaffolding was employed to work safely across the floor extending upward as the works reached ground level. Argyle Maintenance Services received a loud “round of applause” from the client, peformers, performance attendees and the Hamilton Community for the outstanding transformation of this prized Shire asset. Argyle Maintenance Services excel at the difficult and unsual painting projects that other companys do not want to take on, our Project Managers, Supervisor and Tradespersons always find a way to get an out of the ordinary project completed … on time and on budget.

LOCAL GOVERNMENT – MANNINGHAM COUNCIL PEDESTRIAN BRIDGES

BEFORE

AFTER

BEFORE

AFTER

Project Completed:  September 2024

  • Melbourne, Victoria
  • External Preparation and Painting
  • Manningham City Council
  • $15,000

Argyle Maintenance provides painting services to Manningham City Council and were assigned to complete the preparation and painting of several pedestrian bridges in the Council area. These timber bridges are provided over creeks, drainage channels and other obstacles along pathways, trails and bicycle paths in the parks and nature areas throughout the Council. These bridges are exposed to the environment and wear and tear and require regular painting to maintain safety and ascetics. Each bridge requires different treatment as some are painted and some are stained. Environmental and Public Safety are managed by Argyle so that the treatments can be completed. Product choice is paramount so as to obtain the longest lasting finish possible considering the conditions. Several of these bridge painting projects have been completed … on time and on budget.

BODY CORPORATE – BAYSIDE TOWNHOUSE COMPLEX

BEFORE

IN PROGRESS

COMPLETE

Project Completed:  April 2023

  • Aspendale, Victoria
  • Townhouse Complex
  • Action Body Corporate
  • $72,000

Complete external painting of large beach side townhouse complex. Project included painting of timber, render, windows, doors, deck railing, spouting and downpipes. In a harsh oceanside environment preparation and use of appropriate paint products are of the upmost importance not only to maintain the look but to protect building components. With large residential complexes such as this working with the individual owners and tenants is critical to achieving a beautiful long lasting result with the least amount of inconvenience requires planning and communication.

LOCAL GOVERNMENT – YEA TOWN HALL

BEFORE

BEFORE

IN PROGRESS

IN PROGRESS

AFTER

Project Completed:  November 2019

  • Yea, Victoria
  • Historically Listed Town Hall
  • Murindindi Shire Council
  • $117,000

Complete external painting and various carpentry repairs to this historically listed Town Hall. Three story rural town hall requiring repairs to timber components to match existing, minor roof and flashing repairs, flag pole replacement, clock painting and painting with specialised paint to closely match the materials used at the time of it’s construction. The project was futher complicated with High Voltage Power Lines requiring the power provider to re-route power so that the surrounding buildings retained electrical power for the duration of the works. Extensive scaffolding and traffic management providing a safe working environment for staff and the public as the hall was used by the public at various times during the works. The project was completed on time and on budget to Historical Architects exacting specifications and Councils requirements. Argyle Maintenance Services excells at the difficult projects and take great pride in the restoration and completion of reviving these old center of the community assets.

LOCAL GOVERNMENT – MAFFRA SUGAR BEET MUSEUM

BEFORE

IN PROGRESS

AFTER

Project Completed: June 2022

  • Maffra, Victoria
  • Historic Sugar Beet Factory
  • Wellington Shire
  • $78,000

Complete internal and external painting, various carpentry repairs and establishment of a termite barrier around this historic sugar beet factory. Project won at tender preparation included the removal of much of the existing paintwork as it did not meed historical specifications. This community asset and museum build in 1897 rquired numerous carpentry repairs including replaceing weatherboards, windows, hardware and period mouldings to Historic Architect specifications. As has been required by rural councils in termite areas to protect their assets the area around the building was cleared, the building was treated for termites and an termite barrier was established around the building.  Painting included all internal walls and ceilings, complete external including flag pole and signage with colour as per Historic Architect specifications.

INFRASTRUCTURE – THOMPSON ROAD BRIDGE

IN PROGRESS

IN PROGRESS

COMPLETED

Project Completed:  October 2022

  • Carrum Downs, Victoria
  • Anti Carbonation Coating on new bridge
  • Fulton Hogan
  • $80,000

Application of anti carbonation on a new concrete bridge. Argyle Maintenance Services are the “go to” coating application specialists for many of the major infrastructure contractors in Australia. Protecting concrete and steel components of infrastructure works by applying a protective and or anti-graffiti coating not only provides a more appealing aspect to the works it saves the taxpayers money in maintenance in the long term. These projects require qualified High Risk tradespersons, flexibility as components require coatings as the project progresses and on occasion in factory coating prior to erection.

LOCAL GOVERNMENT – PORT ALBERT ROCKET SHED

BEFORE - EXTERNAL

BEFORE INTERNAL

IN PROGRESS - EXTERNAL

IN PROGRESS - INTERNAL

COMPLETE - EXTERNAL

COMPLETE - INTERNAL

Project Completed:  April  2022

  • Port Albert, Victoria
  • Historically Listed Rocket Shed Museum
  • Wellington Shire
  • $50,000

Historically Listed Rocket Shed on the foreshore at Port Albert timber building in extreme environment that required extensive repairs internally and externally, complete painting internally including timber floors, externally, termite treatment, termite barrier and landscaping. The harsh foreshore environment over a long period of time had a severe detrimental effect on this historical community asset. Extensive framing, window replacement, external and internal lining boards replacement were all required prior to painting. Shrubbery removed and a termite barrier was installed around the building. The highest quality paint was applied post repairs to provide long term protection from the elements.

LOCAL GOVERNMENT INFRASTRUCTURE – JOEL JOEL BRIDGE

BEFORE

IN PROGRESS

AFTER

Project Completed: April 2020
  • Stawell, Victoria
  • Rural Road Bridge Structure
  • North Grampians Shire
  • $179,000

Preparation and Coating of steel support structure for timber bridge over the Wimera River. This project, won at tender, had significant site related issues and Authorities involvement i.e. environmentally sensitive area, work over a water course, traffic management and surrounding landowners all required to be addressed. Preparation was the key which included sandblasting, power tool, hand and solvent cleaning and rust removal all to VicRoads Standards. The works were subject to numerous Authority inspections and approvals throughout the process. Rust treatment followed by 3 coats of highly durable paint as per specifications. An approved Environmental Management Plan was required to in place and strictly adhered to during the works, de-mobilisation and clean up. This is a well-travelled rural road, these roads and the bridges such as Joel Joel, are major Local Government maintenance issues and high quality workmanship with great attention to detail are what is required for long term protection and reduced maintenance costs to the ratepayers.

COMMERCIAL RETAIL – 578 MAIN ST. MORDIALLOC

BEFORE

AFTER

Project Completed:  August 2022

  • External Painting of a 2 Level Retail Shop Front
  • Main Street Shopping Strip
  • Private Owner
  • $62,000

Complete external painting of a 2 Level Shop and Apartment. Project located in a High Voltage Electric NO GO ZONE requiring consultation and organization with the local power supply company to make safe the area for erecting scaffolding and working on that scaffolding. Various repairs and patching were required prior to painting along with traffic and pedestrian management while the shop remained open during the works.

LOCAL GOVERNMENT – BEECHWORTH HISTORICAL MUSEUM

BEFORE

IN PROGRESS

AFTER

Project Completed:  September 2022
  • Beechworth, Victoria
  • Historically Listed Building
  • Indigo Shire Council
  • $54,000

Complete internal painting of this historically listed building now housing a museum displaying artifacts and memorabilia from the Beechworth vicinity. This project required careful attention as many of the items could not be moved off site for painting and needed to be moved around to complete the painting. This historical asset, as expected, had all the nooks and crannies, arches, deep window sills and timber doors Argyle Maintenance Services excels at bringing these assets back to the pristine finish they had when built, working with Heritage Architects, Local Government, Historians, and community stakeholders to achieve a long lasting and as close to original as specified asset all can be proud of.